Connect with us

Regional

Kolkata flyover crash toll 23, army, NDRF continue rescue

Published

on

kolkataKolkata :With the discovery of two more bodies, the toll in the flyover tragedy in Kolkata rose to 23 on Friday, as the army and the disaster management teams continued their efforts to find corpses and trapped survivors.

The army, National Disaster Response Force personnel, disaster management alongside the fire brigade and the police worked through the night and on Friday morning using gas cutters and other sophisticated equipment to cut through the rubble and the tonnes of steel, iron and concrete which had given way Thursday afternoon.

Various agencies were also working to clear the devastation caused by collapse of the Vivekananda Road flyover in the Posta area and restore normalcy of traffic in the crowded market locality.

However, the rescue and clearance operations were hampered for some time due to late night rains.

“Two more bodies have been extricated. The toll now is 23,”an officer manning the city police control room told IANS. A total of 60 people are injured, some of them battling for life in various hospitals.

“We will need a couple of days to completely remove the debris and ensure normal traffic movement in the entire area. But we are trying to ensure normal traffic at the important intersection of Rabindra Sarani and Klirkishna Thakur Street in the next few hours,” said a police officer.

A top NDRF official said they needed hydraulic jets to clear the devastation.

“It will be done under a very specialised kind of care. There is a requirement of a hydraulic jet. We need to stabilise this building. And specially the construction company, their specialists, their structural engineers, under their supervision this operation will be condcucted,” said the official.

Chief Minister Mamata Banerjee, who personally coordinated the rescue operations for hours, has announced a compensation of Rs.5 lakh as ex-gratia to the next of the kin of the deceased, Rs.2 lakh each for the critically injured and Rs.1 lakh for people with minor injuries.

Banerjee also formed two expert teams to look into the reasons for the mishap and suggest remedies.

Following Banerjee’s instructions, the police filed an FIR against officials of the ill-fated flyover’s Hyderabad-based implementing agency IVRCL Infrastructure, whose chief termed the mishap as an Act of god.”

“The office of the construction company in the city have been sealed and we will take strong action against them,” said police commissioner Rajeev Kumar.

While Governor K.N. Tripathi sought a report from the Mamata Banerjee government, the incident led to a political slugfest between the ruling Trinamool Congress and the opposition in the poll-bound state.

Experts from Kharagpur-IIT and Jadavpur University told IANS that lack of proper planning, delays, lacunae in design and bad tendering could have triggered the collapse.

Construction workers said the problems had started on the intervening night of Wednesday and Thursday when the concrete casting was being done.

Sunil Sarkar, who was among those doing the concrete casting, said ”the bolt was coming apart as the bucket could not hold it. I think the sunshade in that particular place was made too big”.

Sarkar, now in hospital after sustaining injury when the fly-over collapsed, said a technician was called who welded the bolt in place.

“Our supervisors assured us that everything was in order and asked us to go ahead with the concrete casting.”

“‘The casting continued till noon on Thursday. When the work was almost complete the same part caved in and the flyover gave away,” said the resident of Murshidabad district.

The long-delayed 2.5-km flyover was expected to tackle congestion in Burra Bazar area — the location of one of the largest wholesale markets in Asia — up to the Howrah station, the gateway to the city.

It was scheduled to be ready in 2012 but land acquisition issues delayed its completion. The implementing agency, too ran into financial troubles.

Home

What monkey fled with a bag containing evidence in it: Read full story

Published

on

The court, generally, considers a person who commit a crime and the one who destroys the evidence, as criminals in the eyes of law. But what if an animal destroys the evidence of a crime committed by a human.

In a peculiar incident in Rajasthan, a monkey fled away with the evidence collected by the police in a murder case. The stolen evidence included the murder weapon (a blood-stained knife).

The incident came to light when the police appeared before the court and they had to provide the evidence in the hearing.

The hearing was about the crime which took place in September 2016, in which a person named Shashikant Sharma died at a primary health center under Chandwaji police station. After the body was found, the deceased’s relatives blocked the Jaipur-Delhi highway, demanding an inquiry into the matter.

Following the investigation, the police had arrested Rahul Kandera and Mohanlal Kandera, residents of Chandwaji in relation to the murder. But, when the time came to produce the evidence related to the case, it was found that the police had no evidence with them because a monkey had stolen it from them.

In the court, the police said that the knife, which was the primary evidence, was also taken by the monkey. The cops informed that the evidence of the case was kept in a bag, which was being taken to the court.

The evidence bag contained the knife and 15 other important evidences. However, due to the lack of space in the malkhana, a bag full of evidence was kept under a tree, which led to the incident.

Continue Reading

Trending